> ## Documentation Index
> Fetch the complete documentation index at: https://docs.assetinfinity.ai/llms.txt
> Use this file to discover all available pages before exploring further.

# The critical path through a shutdown's package, in minutes from the start of the plan, with the float on every job that…

> The critical path through a shutdown's package, in minutes from the start of the plan, with the float on every job that is not on it.



## OpenAPI

````yaml /api-reference/openapi.json post /rpc/shutdown_critical_path
openapi: 3.0.0
info:
  description: ''
  title: >-
    The only schema PostgREST exposes. Reads are security_invoker views; writes
    are SECURITY DEFINER functions. Rebuilt wholesale on every deploy — it holds
    no data.
  version: 12.2.3
servers:
  - url: https://app.assetinfinity.ai/api
security: []
tags:
  - name: Signing in
  - name: Profile
  - name: My work
  - name: Sites and locations
  - name: Assets
  - name: Asset lifecycle
  - name: Asset components
  - name: Work lifecycle
  - name: Work order execution
  - name: Work sequencing
  - name: Maintenance
  - name: Inspections
  - name: Checklists
  - name: Verification
  - name: Self verification
  - name: Inventory
  - name: Inventory detail
  - name: Parts demand
  - name: Procurement
  - name: Vendors and contracts
  - name: Contracts
  - name: Amendments
  - name: Vendor spend forecast
  - name: Workforce
  - name: Workforce detail
  - name: Capacity
  - name: Dispatch
  - name: Shutdown
  - name: Permits
  - name: Tools
  - name: Tools on jobs
  - name: Bookings
  - name: Calibration history
  - name: Reliability
  - name: Sensors and meters
  - name: Readers
  - name: Trackers
  - name: Real-time location
  - name: Feeds
  - name: Energy
  - name: IT assets
  - name: IT asset software
  - name: IT asset topology
  - name: Map
  - name: Floor plans
  - name: Labels
  - name: Lost and found
  - name: Visitors
  - name: Root cause analysis
  - name: Costing
  - name: Finance
  - name: Budgets
  - name: Capex plans
  - name: FF&E plans
  - name: Documents
  - name: Document control
  - name: Document folders
  - name: Document tree
  - name: Knowledge
  - name: Reports
  - name: Dashboards
  - name: Extracts
  - name: Data exports
  - name: Audit center
  - name: Audit feed
  - name: Activity
  - name: Conversations
  - name: Notifications
  - name: Date reminders
  - name: Channels
  - name: Search
  - name: Copilot
  - name: Import
  - name: Bulk jobs
  - name: File exchange
  - name: Filing exceptions
  - name: Files
  - name: Sync
  - name: Support
  - name: API keys
  - name: Webhooks
  - name: MCP connections
  - name: MCP sign-in
  - name: SCIM provisioning
  - name: Directory sync
  - name: Security streams
  - name: Single sign-on
  - name: Two-factor sign-in
  - name: Admin
  - name: Access
  - name: Lookups
  - name: Read models
  - name: Reference
  - name: Reference columns
  - name: Reference entry
  - name: List views
  - name: Mapping
  - name: Numbering
  - name: Branding
  - name: Custom fields
  - name: Form studio
  - name: Workflows
  - name: Workflow studio
  - name: Rules
  - name: Statuses and transitions
  - name: Currencies and locales
  - name: Today
  - name: Work configuration
  - name: Asset configuration
  - name: Inventory configuration
  - name: Tool configuration
  - name: Workforce configuration
  - name: Vendor and contract configuration
  - name: Document configuration
  - name: Inspection configuration
  - name: Sites, locations and the organisation
  - name: Setup
  - name: Features
  - name: Billing
  - name: Licence
  - name: Welcome
  - name: Tray
  - name: Tenant switch
  - name: Release
  - name: Telegram
  - name: Inbound mail
  - name: Platform
externalDocs:
  description: PostgREST Documentation
  url: https://postgrest.org/en/v12/references/api.html
paths:
  /rpc/shutdown_critical_path:
    post:
      tags:
        - Shutdown
      summary: >-
        The critical path through a shutdown's package, in minutes from the
        start of the plan, with the float on every job that…
      description: >-
        The critical path through a shutdown's package, in minutes from the
        start of the plan, with the float on every job that is not on it.
      parameters:
        - $ref: '#/components/parameters/preferParams'
      requestBody:
        content:
          application/json:
            schema:
              description: >-
                The critical path through a shutdown's package, in minutes from
                the start of the plan, with the float on every job that is not
                on it.
              properties:
                p_shutdown_id:
                  format: uuid
                  type: string
              required:
                - p_shutdown_id
              type: object
          application/vnd.pgrst.object+json:
            schema:
              description: >-
                The critical path through a shutdown's package, in minutes from
                the start of the plan, with the float on every job that is not
                on it.
              properties:
                p_shutdown_id:
                  format: uuid
                  type: string
              required:
                - p_shutdown_id
              type: object
          application/vnd.pgrst.object+json;nulls=stripped:
            schema:
              description: >-
                The critical path through a shutdown's package, in minutes from
                the start of the plan, with the float on every job that is not
                on it.
              properties:
                p_shutdown_id:
                  format: uuid
                  type: string
              required:
                - p_shutdown_id
              type: object
          text/csv:
            schema:
              description: >-
                The critical path through a shutdown's package, in minutes from
                the start of the plan, with the float on every job that is not
                on it.
              properties:
                p_shutdown_id:
                  format: uuid
                  type: string
              required:
                - p_shutdown_id
              type: object
        required: true
      responses:
        '200':
          description: OK
components:
  parameters:
    preferParams:
      description: Preference
      in: header
      name: Prefer
      required: false
      schema:
        enum:
          - params=single-object
        type: string

````

This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.