Skip to main content
POST
The critical path through a shutdown's package, in minutes from the start of the plan, with the float on every job that is not on it.

Headers

Prefer
enum<string>

Preference

Available options:
params=single-object

Body

The critical path through a shutdown's package, in minutes from the start of the plan, with the float on every job that is not on it.

p_shutdown_id
string<uuid>
required

Response

200

OK